Basement Work

September 17, 2016  •  Leave a Comment

I have been demo'ing the basement. I have pulled the drop ceiling out along with the grid, pulled out the lights and put can lights in. I have pulled 4 new runs from the breaker box and pulled one run of aluminum out and pulled all aluminum to copper patches. I didn't realize aluminum wasn't pronounced aluminum. Its pronounced Al-u-min-i-um. Don't believe me? Ask a Brit.

Anyway, here is a pic of the room I have been working on. This was taken with the house was on the market. 

Here is where I am at now.

That hole is a crawl space. There are a couple in the house. They are open to the basement so the humidity is super high. I crawled in and leveled out the dirt and rolled plastic out. I started cutting insulation have half of it in right now, so I can do a better job at closing this space off from the rest of the basement. This should reduce the humidity and keep it warm in the winter. What a pain.

There were a couple of 6" heavy steal ducts running into the crawl space. I am pulling both and running one new flex duct, in order to reduce the size of the soffit needed. I also temporarily tossed one of the florescent lights I pulled down, in the crawl space so I can see what I'm doing. 

More soon....

 


Comments

No comments posted.
Loading...

Archive
January (1) February March April May June July August September October November December (1)
January February March April May June July August September October November December
January February March April May June July August September October November December
January February March April May June July August September October November December
January February March April May June July August September October November December
January February March April May June July August September October November December
January February March April May June July August September October November December
January February March April May June July August September October November December